Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SCREW MACHINE PRODUCTS
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $1
M
to 5
M
# of Employees 58
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,024
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,725 400,938
kWh
Natural Gas $11,361 2,753
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2514: Cover open tanks $940 $200 $940
10,551
kWh
- -
02 2.1123: Install automatic stack damper $888 $650 - $888
-
MMBtu
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $604 $950 $757
8,499
kWh
$(-153.0)
-
MMBtu
-
04 2.2511: Insulate bare equipment $599 $600 $653
7,327
kWh
$(-54.0)
-
MMBtu
-
05 2.6214: Shut off pilots in standby equipment $198 - - $248
-
MMBtu
$(-50.0)
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $235 - $235
2,638
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $444 $376 $444
4,982
kWh
- -
TOTAL RECOMMENDED $3,908 $2,776 $3,029
33,997
kWh
$929
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED $2,080 $1,926 $2,089
23,446
kWh
$41
-
MMBtu
$(-50.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs