| Assessment Year | 1988 |
|---|---|
| Principal Product | SCREW MACHINE PRODUCTS |
| NAICS |
n/a
|
| SIC | 3451: Screw Machine Products |
| Sales Range | $1 M to 5M |
| # of Employees | 58 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,024
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $35,725 | 400,938 |
kWh
|
$0.089 |
| Natural Gas | $11,361 | 2,753 |
MMBtu
|
$4.13 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $3,908 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,080 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2514: Cover open tanks | $940 | $200 |
$940
10,551
kWh
|
- | - | |
| 02 | 2.1123: Install automatic stack damper | $888 | $650 | - |
$888
-
MMBtu
|
- | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $604 | $950 |
$757
8,499
kWh
|
$(-153.0)
-
MMBtu
|
- | |
| 04 | 2.2511: Insulate bare equipment | $599 | $600 |
$653
7,327
kWh
|
$(-54.0)
-
MMBtu
|
- | |
| 05 | 2.6214: Shut off pilots in standby equipment | $198 | - | - |
$248
-
MMBtu
|
$(-50.0) | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $235 | - |
$235
2,638
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $444 | $376 |
$444
4,982
kWh
|
- | - | |
| TOTAL RECOMMENDED | $3,908 | $2,776 |
$3,029
33,997
kWh
|
$929
-
MMBtu
|
$(-50.0) | ||
| TOTAL IMPLEMENTED | $2,080 | $1,926 |
$2,089
23,446
kWh
|
$41
-
MMBtu
|
$(-50.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs