ITAC Assessment: MS0320
ITAC logo
ITAC Assessment: MS0320
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Motion Furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 69,400
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,285 1,171,200
kWh
Electricity Demand $37,703 3,569
kW-mo/yr
Electricity Fees $1,787 -
Natural Gas $6,537 552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $49,454 $130,000 $21,233
468,000
kWh
$19,609
-
kW-mo/yr
$8,612
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,042 $8,052 $1,640
36,138
kWh
$1,358
-
kW-mo/yr
$44
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,124 $356 $1,108
24,063
kWh
- $16
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,936 $10,579 $978
21,546
kWh
$930
-
kW-mo/yr
$28
05 2.4221: Install compressor air intakes in coolest locations $340 $635 $159
3,504
kWh
$176
-
kW-mo/yr
$5
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $246 $375 $218
4,794
kWh
$25
-
kW-mo/yr
$3
TOTAL RECOMMENDED $56,142 $149,997 $25,336
558,045
kWh
$22,098
-
kW-mo/yr
$8,708
TOTAL IMPLEMENTED $3,646 $11,945 $2,463
53,907
kWh
$1,131
-
kW-mo/yr
$52
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings