ITAC Assessment: MS0310
ITAC logo
ITAC Assessment: MS0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Cotton
NAICS 313210: Broadwoven Fabric Mills
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 84,000
ft2
Annual Production 80,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $499,264 6,833,488
kWh
Electricity Demand $1,220 2,636
kW-mo/yr
Electricity Fees $245,360 -
LPG $86,679 5,687
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,634 $7,425 $3,415
65,520
kWh
$1,151
-
kW-mo/yr
$68
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,338 $6,046 $986
18,906
kWh
$332
-
kW-mo/yr
$20
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $755 $144 $744
14,293
kWh
- $11
04 2.4221: Install compressor air intakes in coolest locations $105 $82 $71
1,354
kWh
$32
-
kW-mo/yr
$2
TOTAL RECOMMENDED $6,832 $13,697 $5,216
100,073
kWh
$1,515
-
kW-mo/yr
$101
TOTAL IMPLEMENTED $6,832 $13,697 $5,216
100,073
kWh
$1,515
-
kW-mo/yr
$101
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs