Assessment Year | 2003 |
---|---|
Principal Product | Automotive Cam Covers |
NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
SIC | 3364: Nonferrous Die-Castings, Except Aluminum |
Sales Range | $10 M to 50M |
# of Employees | 156 |
Plant Area |
110,000
ft2
|
Annual Production | 4,300,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $318,168 | 11,784,000 |
kWh
|
$0.027 |
Electricity Demand | $162,580 | 27,348 |
kW-mo/yr
|
$5.94 |
Natural Gas | $106,323 | 15,410 |
MMBtu
|
$6.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,392 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,321 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,324 | $217 |
$938
34,740
kWh
|
$386
-
kW-mo/yr
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $1,638 | $658 |
$1,638
60,673
kWh
|
- | |
03 | 2.4224: Upgrade controls on compressors | $2,359 | $5,925 |
$2,359
87,360
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,445 | $20,703 |
$8,132
301,200
kWh
|
$3,313
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,172 | $7,848 |
$831
30,780
kWh
|
$341
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $950 | $1,729 |
$950
35,191
kWh
|
- | |
07 | 2.7134: Use photocell controls | $504 | $1,585 |
$358
13,260
kWh
|
$146
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $19,392 | $38,665 |
$15,206
563,204
kWh
|
$4,186
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $5,321 | $6,800 |
$4,935
182,773
kWh
|
$386
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs