Assessment Year | 2006 |
---|---|
Principal Product | vinyl |
NAICS | 313310: Textile and Fabric Finishing Mills |
SIC | 2295: Coated Fabrics, Not Rubberized |
Sales Range | $100 M to 500M |
# of Employees | 375 |
Plant Area |
700,000
ft2
|
Annual Production | 300,000,000
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,140,801 | 36,017,600 |
kWh
|
$0.032 |
Electricity Demand | $704,150 | 72,701 |
kW-mo/yr
|
$9.69 |
Electricity Fees | $30,374 | - |
|
- |
Natural Gas | $1,572,843 | 171,573 |
MMBtu
|
$9.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,124 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,110 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,158 | $36,274 |
$19,314
505,597
kWh
|
$8,537
-
kW-mo/yr
|
$(-3,693.0) | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,061 | $87,943 |
$16,124
422,088
kWh
|
$8,169
-
kW-mo/yr
|
$(-3,232.0) | - | |
03 | 2.2135: Repair and eliminate steam leaks | $6,813 | $37 | - | - | - |
$6,813
-
MMBtu
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,542 | $3,825 |
$2,581
67,555
kWh
|
$1,507
-
kW-mo/yr
|
$(-546.0) | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,141 | $223 |
$2,457
64,315
kWh
|
- | $(-316.0) | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,014 | $410 |
$717
18,769
kWh
|
$453
-
kW-mo/yr
|
$(-156.0) | - | |
07 | 2.2136: Install / repair insulation on steam lines | $395 | $48 | - | - | - |
$395
-
MMBtu
|
|
TOTAL RECOMMENDED | $59,124 | $128,760 |
$41,193
1,078,324
kWh
|
$18,666
-
kW-mo/yr
|
$(-7,943.0) |
$7,208
-
MMBtu
|
||
TOTAL IMPLEMENTED | $58,110 | $128,350 |
$40,476
1,059,555
kWh
|
$18,213
-
kW-mo/yr
|
$(-7,787.0) |
$7,208
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs