Assessment Year | 2004 |
---|---|
Principal Product | Flour and corn tortillas, and Mexican food products |
NAICS | 311830: Tortilla Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 110 |
Plant Area |
55,000
ft2
|
Annual Production | 7,800,000
lb
|
Production Hrs. Annual | 4,332
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,018 | 807,334 |
kWh
|
$0.040 |
Electricity Demand | $35,811 | 2,692 |
kW-mo/yr
|
$13.30 |
Electricity Fees | $540 | - |
|
- |
Natural Gas | $96,117 | 15,788 |
MMBtu
|
$6.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,044 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,070 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,040 | $500 |
$730
20,310
kWh
|
$1,310
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $930 | $15 |
$330
9,121
kWh
|
$600
-
kW-mo/yr
|
- | - | |
03 | 2.2135: Repair and eliminate steam leaks | $700 | $100 | - | - |
$700
-
MMBtu
|
- | |
04 | 2.7124: Make a practice of turning off lights when not needed | $660 | - |
$660
18,200
kWh
|
- | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $370 | $250 | - | - |
$370
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $134 | $70 |
$24
670
kWh
|
$12
-
kW-mo/yr
|
- | $98 | |
07 | 2.2511: Insulate bare equipment | $120 | $140 |
$80
2,170
kWh
|
$40
-
kW-mo/yr
|
- | - | |
08 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $90 | $10 |
$60
1,600
kWh
|
$30
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $5,044 | $1,085 |
$1,884
52,071
kWh
|
$1,992
-
kW-mo/yr
|
$1,070
-
MMBtu
|
$98 | ||
TOTAL IMPLEMENTED | $3,070 | $750 |
$1,390
38,510
kWh
|
$1,310
-
kW-mo/yr
|
$370
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs