Assessment Year | 2006 |
---|---|
Principal Product | copper tubing |
NAICS | 331420: Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3351: Rolling, Drawing, and Extruding Of Copper |
Sales Range | $100 M to 500M |
# of Employees | 370 |
Plant Area |
420,000
ft2
|
Annual Production | 220,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,478,582 | 57,293,550 |
kWh
|
$0.026 |
Electricity Demand | $1,144,460 | 106,855 |
kW-mo/yr
|
$10.71 |
Electricity Fees | $72,266 | - |
|
- |
Natural Gas | $5,434,615 | 59,357 |
MMBtu
|
$91.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $157,273 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $93,222 | $290,000 |
$56,522
2,102,755
kWh
|
$35,322
-
kW-mo/yr
|
$1,378 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $47,448 | $70,420 |
$30,781
1,145,111
kWh
|
$15,966
-
kW-mo/yr
|
$701 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,175 | $21,180 |
$11,010
409,602
kWh
|
- | $165 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,047 | $10,811 |
$1,062
39,524
kWh
|
$954
-
kW-mo/yr
|
$31 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,760 | $172 |
$1,734
64,527
kWh
|
- | $26 | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,240 | $609 |
$704
26,208
kWh
|
$518
-
kW-mo/yr
|
$18 | |
07 | 2.7229: Air condition only space necessary | $381 | $240 |
$111
4,147
kWh
|
$264
-
kW-mo/yr
|
$6 | |
TOTAL RECOMMENDED | $157,273 | $393,432 |
$101,924
3,791,874
kWh
|
$53,024
-
kW-mo/yr
|
$2,325 | ||
TOTAL IMPLEMENTED | $3,000 | $781 |
$2,438
90,735
kWh
|
$518
-
kW-mo/yr
|
$44 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs