| Assessment Year | 2006 |
|---|---|
| Principal Product | Meat |
| NAICS | 311611: Animal (except Poultry) Slaughtering |
| SIC | 2011: Meat Packing Plants |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
35,650
ft2
|
| Annual Production | 15,000,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $59,842 | 2,129,300 |
kWh
|
$0.028 |
| Electricity Fees | $72,274 | - |
|
- |
| Natural Gas | $144,639 | 13,312 |
MMBtu
|
$10.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,497 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $3,933 | $670 | - | - |
$3,933
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,385 | $176 |
$361
61,364
kWh
|
$2,024 | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,307 | $2,895 |
$195
33,627
kWh
|
$1,112 | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,168 | $7,343 |
$174
30,054
kWh
|
$994 | - | |
| 05 | 3.6124: Burn waste oil for heat | $564 | $3,595 | - | - |
$564
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $421 | $55 | - | - |
$421
-
MMBtu
|
|
| 07 | 2.7221: Lower temperature during the winter season and vice-versa | $351 | $210 |
$52
9,039
kWh
|
$299 | - | |
| 08 | 2.2136: Install / repair insulation on steam lines | $235 | $62 | - | - |
$235
-
MMBtu
|
|
| 09 | 2.4221: Install compressor air intakes in coolest locations | $133 | $233 |
$20
3,422
kWh
|
$113 | - | |
| TOTAL RECOMMENDED | $10,497 | $15,239 |
$802
137,506
kWh
|
$4,542 |
$5,153
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs