ITAC Assessment: MS0284
ITAC logo
ITAC Assessment: MS0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Upholstered Furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $50
M
to 100
M
# of Employees 83
Plant Area 900,000
ft2
Annual Production 275,000
pieces
Production Hrs. Annual 1,960
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,703 1,609,800
kWh
Electricity Demand $63,189 5,556
kW-mo/yr
Electricity Fees $2,473 -
Natural Gas $31,819 2,765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,052 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7124: Make a practice of turning off lights when not needed $36,175 $17,496 $35,640
1,018,880
kWh
- $535
02 2.7142: Utilize higher efficiency lamps and/or ballasts $25,305 $66,153 $15,190
434,244
kWh
$9,741
-
kW-mo/yr
$374
03 2.7447: Install vinyl strip / high speed / air curtain doors $235 - $232
6,624
kWh
- $3
04 2.7224: Reduce space conditioning during non-working hours $212 $472 $209
5,976
kWh
- $3
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $125 $146 $123
3,516
kWh
- $2
TOTAL RECOMMENDED $62,052 $84,267 $51,394
1,469,240
kWh
$9,741
-
kW-mo/yr
$917
TOTAL IMPLEMENTED $36,300 $17,642 $35,763
1,022,396
kWh
- $537
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs