ITAC Assessment: MS0260
ITAC logo
ITAC Assessment: MS0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Automotive Pistons
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592: Carburetors, Pistons, Piston Rings, and Valves
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 57,600
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,236 851,490
kWh
Electricity Demand $28,332 3,343
kW-mo/yr
Electricity Fees $958 -
Natural Gas $121,344 15,430
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,152

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings By-product Production Savings
01 4.521: Clear and rent existing space $28,604 $10,000 $412
11,727
kWh
$577
-
kW-mo/yr
$15 - - $27,600
02 2.2414: Use waste heat from hot flue gases to preheat $12,850 $1,350 - - - $12,850
-
MMBtu
- -
03 3.4151: Minimize water usage $9,057 $107 $(-33.0)
(-950)
kWh
$(-43.0)
-
kW-mo/yr
$(-2.0) - $9,135
-
Tgal
-
04 2.7261: Install timers and/or thermostats $3,685 $1,666 - - - $3,685
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $811 $348 $800
22,738
kWh
- $11 - - -
06 2.7122: Disconnect ballasts $341 $408 $301
8,556
kWh
$35
-
kW-mo/yr
$5 - - -
07 2.2514: Cover open tanks $312 $68 - - - $312
-
MMBtu
- -
TOTAL RECOMMENDED $55,660 $13,947 $1,480
42,071
kWh
$569
-
kW-mo/yr
$29 $16,847
-
MMBtu
$9,135
-
Tgal
$27,600
TOTAL IMPLEMENTED $1,152 $756 $1,101
31,294
kWh
$35
-
kW-mo/yr
$16 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs