ITAC Assessment: BD0419
ITAC logo
ITAC Assessment: BD0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Uncoated recycled paperboard
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $1
M
to 5
M
# of Employees 46
Plant Area 87,500
ft2
Annual Production 42,000
ton
Production Hrs. Annual 8,712
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $826,142 20,195,095
kWh
Electricity Demand $98,952 32,369
kW-mo/yr
Electricity Fees $14,259 -
Natural Gas $767,205 213,487
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,031 $31,529 $11,820
288,990
kWh
$1,211
-
kW-mo/yr
- - -
02 2.1213: Direct warmest air to combustion intake $10,810 $14,000 - - $10,810
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,421 $7,300 $2,196
53,677
kWh
$225
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $929 $1,200 $770
18,819
kWh
$159
-
kW-mo/yr
- - -
05 2.4314: Use synthetic lubricant $849 $500 $770
18,821
kWh
$79
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $820 $20 $744
18,193
kWh
$76
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $648 $220 $588
14,377
kWh
$60
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $642 $600 $308
7,323
kWh
$31
-
kW-mo/yr
- $127 $176
09 2.2136: Install / repair insulation on steam lines $421 $700 - - $421
-
MMBtu
- -
TOTAL RECOMMENDED $30,571 $56,069 $17,196
420,200
kWh
$1,841
-
kW-mo/yr
$11,231
-
MMBtu
$127 $176
TOTAL IMPLEMENTED $16,802 $40,729 $14,786
361,486
kWh
$1,595
-
kW-mo/yr
$421
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs