Assessment Year | 2004 |
---|---|
Principal Product | Furniture/bedding fiber |
NAICS | 337910: Mattress Manufacturing |
SIC | 2515: Mattresses, Foundations, and Convertible Beds |
Sales Range | $10 M to 50M |
# of Employees | 87 |
Plant Area |
170,000
ft2
|
Annual Production | 18,000,000
lb
|
Production Hrs. Annual | 5,500
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,234 | 3,974,160 |
kWh
|
$0.036 |
Electricity Demand | $76,459 | 9,830 |
kW-mo/yr
|
$7.78 |
Electricity Fees | $3,496 | - |
|
- |
Natural Gas | $163,103 | 31,639 |
MMBtu
|
$5.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $104,033 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,164 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $82,017 | $6,780 | - | - | - |
$82,017
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,496 | $15,583 |
$5,287
159,530
kWh
|
$3,083
-
kW-mo/yr
|
$126 | - | |
03 | 2.1224: Replace boiler | $6,523 | $4,642 | - | - | - |
$6,523
-
MMBtu
|
|
04 | 2.7134: Use photocell controls | $3,354 | $1,036 |
$3,304
99,705
kWh
|
- | $50 | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,071 | $156 |
$2,040
61,571
kWh
|
- | $31 | - | |
06 | 2.2437: Recover waste heat from equipment | $1,263 | $1,542 | - | - | - |
$1,263
-
MMBtu
|
|
07 | 2.7261: Install timers and/or thermostats | $216 | $355 |
$213
6,422
kWh
|
- | $3 | - | |
08 | 2.7122: Disconnect ballasts | $93 | $180 |
$56
1,683
kWh
|
$35
-
kW-mo/yr
|
$2 | - | |
TOTAL RECOMMENDED | $104,033 | $30,274 |
$10,900
328,911
kWh
|
$3,118
-
kW-mo/yr
|
$212 |
$89,803
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,164 | $336 |
$2,096
63,254
kWh
|
$35
-
kW-mo/yr
|
$33 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs