ITAC Assessment: MS0243
ITAC logo
ITAC Assessment: MS0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 144,000
ft2
Annual Production 47,200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,134 5,336,000
kWh
Electricity Demand $72,566 9,259
kW-mo/yr
Electricity Fees $4,125 -
Natural Gas $74,091 8,342
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2447: Heat water with exhaust heat $10,578 $12,948 - - - $10,578
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,144 $10,559 $4,075
112,641
kWh
$1,978
-
kW-mo/yr
$91 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,790 - $3,127
94,106
kWh
$1,592
-
kW-mo/yr
$71 -
04 2.2414: Use waste heat from hot flue gases to preheat $4,691 $1,256 - - - $4,691
-
MMBtu
05 2.3132: Recharge batteries on during off-peak demand periods $3,385 - - $3,335
-
kW-mo/yr
$50 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $614 $114 $605
18,205
kWh
- $9 -
TOTAL RECOMMENDED $30,202 $24,877 $7,807
224,952
kWh
$6,905
-
kW-mo/yr
$221 $15,269
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs