Assessment Year | 2004 |
---|---|
Principal Product | Cheese |
NAICS | 311513: Cheese Manufacturing |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
144,000
ft2
|
Annual Production | 47,200,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $182,134 | 5,336,000 |
kWh
|
$0.034 |
Electricity Demand | $72,566 | 9,259 |
kW-mo/yr
|
$7.84 |
Electricity Fees | $4,125 | - |
|
- |
Natural Gas | $74,091 | 8,342 |
MMBtu
|
$8.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,202 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2447: Heat water with exhaust heat | $10,578 | $12,948 | - | - | - |
$10,578
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,144 | $10,559 |
$4,075
112,641
kWh
|
$1,978
-
kW-mo/yr
|
$91 | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,790 | - |
$3,127
94,106
kWh
|
$1,592
-
kW-mo/yr
|
$71 | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $4,691 | $1,256 | - | - | - |
$4,691
-
MMBtu
|
|
05 | 2.3132: Recharge batteries on during off-peak demand periods | $3,385 | - | - |
$3,335
-
kW-mo/yr
|
$50 | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $614 | $114 |
$605
18,205
kWh
|
- | $9 | - | |
TOTAL RECOMMENDED | $30,202 | $24,877 |
$7,807
224,952
kWh
|
$6,905
-
kW-mo/yr
|
$221 |
$15,269
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs