ITAC Assessment: MS0235
ITAC logo
ITAC Assessment: MS0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Metal Castings and Fabricated Equipment
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 400,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,183 4,632,272
kWh
Electricity Fees $119,284 -
Natural Gas $25,538 3,056
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,844 $4,555 n/a $614
34,966
kWh
$367
-
kW-mo/yr
$863 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,701 $480 n/a $855
34,392
kWh
- $846 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,654 $3,151 n/a $463
26,390
kWh
$535
-
kW-mo/yr
$656 -
04 2.8121: Apply for tax-free status for energy purchases $1,634 $50 n/a - - $1,634 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,595 $3,236 n/a $996
24,092
kWh
- $599 -
06 2.7261: Install timers and/or thermostats $1,207 $500 n/a $503
26,170
kWh
- $704 -
07 2.7141: Lower light fixtures in high ceiling areas $485 $568 n/a $115
6,465
kWh
$184
-
kW-mo/yr
$186 -
08 2.6214: Shut off pilots in standby equipment $424 $64 n/a - - - $424
-
MMBtu
09 2.8114: Change rate schedules or other changes in utility service $390 $25 n/a - - - $390
-
MMBtu
10 2.7134: Use photocell controls $172 $38 n/a $72
4,081
kWh
- $100 -
TOTAL RECOMMENDED $11,106 $12,667 $3,618
156,556
kWh
$1,086
-
kW-mo/yr
$5,588 $814
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs