ITAC Assessment: MS0226
ITAC logo
ITAC Assessment: MS0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Plastic extrusion and plastic injection molded parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 132,000
ft2
Annual Production 33,840,000
lb
Production Hrs. Annual 84,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Demand $479,787 12,823,715
kW-mo/yr
Electricity Fees $(-48,219.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,276

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,996 - - $19,927
-
kW-mo/yr
$(-931.0)
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,859 $2,372 $3,399
93,385
kWh
$1,698
-
kW-mo/yr
$(-238.0)
03 2.2511: Insulate bare equipment $2,660 $1,669 $2,791
76,663
kWh
- $(-131.0)
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,417 $205 $2,536
69,657
kWh
- $(-119.0)
05 2.7261: Install timers and/or thermostats $886 $591 $930
25,538
kWh
- $(-44.0)
TOTAL RECOMMENDED $29,818 $4,837 $9,656
265,243
kWh
$21,625
-
kW-mo/yr
$(-1,463.0)
TOTAL IMPLEMENTED $7,276 $2,577 $5,935
163,042
kWh
$1,698
-
kW-mo/yr
$(-357.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs