Assessment Year | 2003 |
---|---|
Principal Product | Galvanized and galvalume steel |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 81 |
Plant Area |
220,000
ft2
|
Annual Production | 600,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,113,395 | 32,329,504 |
kWh
|
$0.034 |
Electricity Demand | $358,701 | 60,825 |
kW-mo/yr
|
$5.90 |
Electricity Fees | $194,340 | - |
|
- |
Natural Gas | $1,201,377 | 306,600 |
MMBtu
|
$3.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,821 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,054 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,764 | $670 |
$5,252
152,221
kWh
|
- | $512 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,290 | $4,667 |
$3,908
113,289
kWh
|
- | $382 | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,074 | $1,368 |
$1,346
39,012
kWh
|
$522
-
kW-mo/yr
|
$206 | |
04 | 2.7291: Reschedule and rearrange multiple-source heating systems | $1,449 | $400 |
$310
8,986
kWh
|
$971
-
kW-mo/yr
|
$168 | |
05 | 2.7134: Use photocell controls | $244 | $296 |
$223
6,453
kWh
|
- | $21 | |
TOTAL RECOMMENDED | $13,821 | $7,401 |
$11,039
319,961
kWh
|
$1,493
-
kW-mo/yr
|
$1,289 | ||
TOTAL IMPLEMENTED | $10,054 | $5,337 |
$9,160
265,510
kWh
|
- | $894 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs