ITAC Assessment: MS0211
ITAC logo
ITAC Assessment: MS0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Upholstered furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 162
Plant Area 189,671
ft2
Annual Production 182,500
pieces
Production Hrs. Annual 2,025
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,335 908,000
kWh
Electricity Demand $62,996 6,764
kW-mo/yr
Electricity Fees $5,493 -
Natural Gas $24,860 3,685
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,633

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $2,096 $1,739 - - - $2,096
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,516 $577 $1,494
45,061
kWh
- $22 - - - -
03 2.2437: Recover waste heat from equipment $864 $2,540 - - - $864
-
MMBtu
- - -
04 2.7261: Install timers and/or thermostats $675 $472 $665
20,063
kWh
- $10 - - - -
05 2.7122: Disconnect ballasts $442 $255 $154
4,650
kWh
$281
-
kW-mo/yr
$7 - - - -
06 4.132: Purchase new equipment to reduce material use / cost $48,814 $175,000 - - - - $9,471
-
lb
$5,490 $33,853
TOTAL RECOMMENDED $54,407 $180,583 $2,313
69,774
kWh
$281
-
kW-mo/yr
$39 $2,960
-
MMBtu
$9,471
-
lb
$5,490 $33,853
TOTAL IMPLEMENTED $2,633 $1,304 $2,313
69,774
kWh
$281
-
kW-mo/yr
$39 - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs