ITAC Assessment: MA0519
ITAC logo
ITAC Assessment: MA0519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Pump and engine control systems
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 408
Plant Area 240,000
ft2
Annual Production 350
pieces
Production Hrs. Annual 4,810
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $432,265 8,220,351
kWh
Electricity Demand $163,846 18,246
kW-mo/yr
Electricity Fees $9,447 -
Natural Gas $117,164 18,042
MMBtu
Fuel Oil #2 $202,699 19,925
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,584

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,771 $13,775 $12,602
227,476
kWh
- $4,976
-
MMBtu
$11,193
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $17,181 $2,500 - $17,181
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,294 $6,675 $6,294
113,616
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,344 $450 $1,344
24,260
kWh
- - -
05 2.7124: Make a practice of turning off lights when not needed $1,240 $500 $1,240
22,464
kWh
- - -
TOTAL RECOMMENDED $54,830 $23,900 $21,480
387,816
kWh
$17,181
-
kW-mo/yr
$4,976
-
MMBtu
$11,193
-
MMBtu
TOTAL IMPLEMENTED $2,584 $950 $2,584
46,724
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs