ITAC Assessment: MS0208
ITAC logo
ITAC Assessment: MS0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Industrial handling equipment
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 62
Plant Area 68,000
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,364 808,560
kWh
Electricity Demand $21,196 3,533
kW-mo/yr
Electricity Fees $7,366 -
Natural Gas $5,246 398
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $2,668 $2,700 - $2,668 -
02 2.7261: Install timers and/or thermostats $919 $591 $906
21,216
kWh
$13 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $244 $129 $240
5,644
kWh
$4 -
04 3.5316: Contract a wood pallet recycling company $960 - - - $960
-
lb
05 3.1191: Change procedures / equipment / operating conditions $905 $374 - - $905
-
lb
TOTAL RECOMMENDED $5,696 $3,794 $1,146
26,860
kWh
$2,685 $1,865
-
lb
TOTAL IMPLEMENTED $1,204 $129 $240
5,644
kWh
$4 $960
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs