ITAC Assessment: MS0204
ITAC logo
ITAC Assessment: MS0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aluminum foil
NAICS
n/a
SIC 3353: Aluminum Sheet, Plate, and Foil
Sales Range $50
M
to 100
M
# of Employees 138
Plant Area 181,000
ft2
Annual Production 45,839,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,758 16,298,650
kWh
Electricity Demand $293,477 33,327
kW-mo/yr
Electricity Fees $352,370 -
Natural Gas $513,534 93,061
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $218

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2442: Preheat combustion air with waste heat $97,931 $34,200 - - - $97,931
-
MMBtu
-
02 2.2442: Preheat combustion air with waste heat $10,266 $5,760 - - - $10,266
-
MMBtu
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,500 $3,763 - - - $7,500
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,399 $331 $1,645
195,487
kWh
- $3,754 - -
05 2.7292: Lower ceiling to reduce conditioned space $3,771 $1,000 $667
79,132
kWh
$810
-
kW-mo/yr
$1,812 $482
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $1,549 $2,030 $472
55,979
kWh
- $1,077 - -
07 2.7122: Disconnect ballasts $129 $256 $30
3,517
kWh
$23
-
kW-mo/yr
$76 - -
08 4.821: Pay bills on time to avoid late fees $89 $25 - - - - $89
TOTAL RECOMMENDED $126,634 $47,365 $2,814
334,115
kWh
$833
-
kW-mo/yr
$6,719 $116,179
-
MMBtu
$89
TOTAL IMPLEMENTED $218 $281 $30
3,517
kWh
$23
-
kW-mo/yr
$76 - $89
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs