Assessment Year | 2002 |
---|---|
Principal Product | Aluminum foil |
NAICS |
n/a
|
SIC | 3353: Aluminum Sheet, Plate, and Foil |
Sales Range | $50 M to 100M |
# of Employees | 138 |
Plant Area |
181,000
ft2
|
Annual Production | 45,839,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $134,758 | 16,298,650 |
kWh
|
$0.008 |
Electricity Demand | $293,477 | 33,327 |
kW-mo/yr
|
$8.81 |
Electricity Fees | $352,370 | - |
|
- |
Natural Gas | $513,534 | 93,061 |
MMBtu
|
$5.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,634 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $218 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $97,931 | $34,200 | - | - | - |
$97,931
-
MMBtu
|
- | |
02 | 2.2442: Preheat combustion air with waste heat | $10,266 | $5,760 | - | - | - |
$10,266
-
MMBtu
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,500 | $3,763 | - | - | - |
$7,500
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,399 | $331 |
$1,645
195,487
kWh
|
- | $3,754 | - | - | |
05 | 2.7292: Lower ceiling to reduce conditioned space | $3,771 | $1,000 |
$667
79,132
kWh
|
$810
-
kW-mo/yr
|
$1,812 |
$482
-
MMBtu
|
- | |
06 | 2.7261: Install timers and/or thermostats | $1,549 | $2,030 |
$472
55,979
kWh
|
- | $1,077 | - | - | |
07 | 2.7122: Disconnect ballasts | $129 | $256 |
$30
3,517
kWh
|
$23
-
kW-mo/yr
|
$76 | - | - | |
08 | 4.821: Pay bills on time to avoid late fees | $89 | $25 | - | - | - | - | $89 | |
TOTAL RECOMMENDED | $126,634 | $47,365 |
$2,814
334,115
kWh
|
$833
-
kW-mo/yr
|
$6,719 |
$116,179
-
MMBtu
|
$89 | ||
TOTAL IMPLEMENTED | $218 | $281 |
$30
3,517
kWh
|
$23
-
kW-mo/yr
|
$76 | - | $89 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs