ITAC Assessment: ME0149
ITAC logo
ITAC Assessment: ME0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Magazines
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 108,000
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $439,424 5,370,457
kWh
LPG $140,503 30,066
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,984

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $26,535 $2,500 $26,535
558,910
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,858 $54,394 $16,858
182,298
kWh
- - - -
03 2.6212: Turn off equipment during breaks, reduce operating time $10,296 - $10,296
123,388
kWh
- - - -
04 2.7314: Reduce ventilation air $8,429 $22 - $8,429
-
MMBtu
- - -
05 4.321: Optimize production lot sizes and inventories $7,147 $28,000 - - - - $7,147
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,299 $200 $6,299
76,202
kWh
- - - -
07 2.4221: Install compressor air intakes in coolest locations $5,656 $1,500 $5,656
68,288
kWh
- - - -
08 2.4133: Use most efficient type of electric motors $4,655 $9,358 $4,655
56,272
kWh
- - - -
09 2.8123: Pay utility bills on time $577 - - - - - $577
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $522 $644 $522
6,448
kWh
- - - -
11 3.5217: Reuse / recycle/ sell paper products $6,960 $1,600 - - - $6,960
-
lb
-
12 3.6124: Burn waste oil for heat $1,985 $4,505 - $785
-
MMBtu
$1,200
-
gal
- -
TOTAL RECOMMENDED $95,919 $102,723 $70,821
1,071,806
kWh
$9,214
-
MMBtu
$1,200
-
gal
$6,960
-
lb
$7,724
TOTAL IMPLEMENTED $31,984 $1,822 $16,595
199,590
kWh
$8,429
-
MMBtu
- $6,960
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs