ITAC Assessment: IA0265
ITAC logo
ITAC Assessment: IA0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product vinyl windows
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 175,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 5,120
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,548 2,264,094
kWh
Electricity Demand $35,169 5,940
kW-mo/yr
Natural Gas $27,822 4,728
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,188

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,585 $989 $4,150
179,634
kWh
$2,435
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $512 $116 $348
15,051
kWh
$164
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,284 $887 $1,439
62,280
kWh
$845
-
kW-mo/yr
- - -
04 3.5215: Avoid contamination of end pieces and reuse as feed stock $18,000 $22,100 - - $18,000
-
lb
- -
05 4.423: Move product using mechanical means $96,543 $50,000 - - - $94,043 $2,500
06 4.322: Eliminate old stock and modify inventory control $11,603 $1,088 - - - $11,603 -
TOTAL RECOMMENDED $135,527 $75,180 $5,937
256,965
kWh
$3,444
-
kW-mo/yr
$18,000
-
lb
$105,646 $2,500
TOTAL IMPLEMENTED $36,188 $24,177 $4,150
179,634
kWh
$2,435
-
kW-mo/yr
$18,000
-
lb
$11,603 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs