Assessment Year | 2002 |
---|---|
Principal Product | Aluminum cable |
NAICS |
n/a
|
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
153,000
ft2
|
Annual Production | 28,000,000
lb
|
Production Hrs. Annual | 7,332
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $86,742 | 9,646,800 |
kWh
|
$0.009 |
Electricity Demand | $107,820 | 21,564 |
kW-mo/yr
|
$5.00 |
Electricity Fees | $239,834 | - |
|
- |
Natural Gas | $97,954 | 18,970 |
MMBtu
|
$5.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,774 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,568 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $5,968 | $1,701 | - | - | - |
$5,968
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,494 | $1,000 | - | - | - |
$3,494
-
MMBtu
|
|
03 | 2.2414: Use waste heat from hot flue gases to preheat | $3,150 | $7,965 | - | - | - |
$3,150
-
MMBtu
|
|
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,088 | $51 |
$853
28,804
kWh
|
$219
-
kW-mo/yr
|
$16 | - | |
05 | 2.7261: Install timers and/or thermostats | $74 | $119 |
$73
2,469
kWh
|
- | $1 | - | |
TOTAL RECOMMENDED | $13,774 | $10,836 |
$926
31,273
kWh
|
$219
-
kW-mo/yr
|
$17 |
$12,612
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,568 | $1,119 |
$73
2,469
kWh
|
- | $1 |
$3,494
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs