ITAC Assessment: MS0195
ITAC logo
ITAC Assessment: MS0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aluminum cable
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 153,000
ft2
Annual Production 28,000,000
lb
Production Hrs. Annual 7,332
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,742 9,646,800
kWh
Electricity Demand $107,820 21,564
kW-mo/yr
Electricity Fees $239,834 -
Natural Gas $97,954 18,970
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $5,968 $1,701 - - - $5,968
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,494 $1,000 - - - $3,494
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $3,150 $7,965 - - - $3,150
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $1,088 $51 $853
28,804
kWh
$219
-
kW-mo/yr
$16 -
05 2.7261: Install timers and/or thermostats $74 $119 $73
2,469
kWh
- $1 -
TOTAL RECOMMENDED $13,774 $10,836 $926
31,273
kWh
$219
-
kW-mo/yr
$17 $12,612
-
MMBtu
TOTAL IMPLEMENTED $3,568 $1,119 $73
2,469
kWh
- $1 $3,494
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs