Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Clay Construction Brick
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area 56,685
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,355 2,950,762
kWh
Electricity Demand $89,975 9,517
kW-mo/yr
Electricity Fees $3,223 -
Natural Gas $322,670 106,840
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,294

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $790 $263 $778
23,154
kWh
$12 -
02 2.7261: Install timers and/or thermostats $74 $119 $73
2,052
kWh
$1 -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,504 $2,060 - - $1,504
-
MMBtu
04 2.2515: Use optimum thickness insulation $15,653 $9,593 - - $15,653
-
MMBtu
TOTAL RECOMMENDED $18,021 $12,035 $851
25,206
kWh
$13 $17,157
-
MMBtu
TOTAL IMPLEMENTED $2,294 $2,323 $778
23,154
kWh
$12 $1,504
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs