ITAC Assessment: MS0148
ITAC logo
ITAC Assessment: MS0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Super-Absorbent Polymers
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 140
Plant Area 139,435
ft2
Annual Production 145,267,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,056,606 31,806,272
kWh
Electricity Demand $481,995 49,525
kW-mo/yr
Electricity Fees $(-66,952.0) -
Natural Gas $1,395,755 525,573
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,899

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,990 $30,779 $8,857
266,706
kWh
- $133 - - -
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,778 $792 $872
26,377
kWh
$880
-
kW-mo/yr
$26 - - -
03 2.7134: Use photocell controls $2,140 $1,195 $2,108
63,599
kWh
- $32 - - -
04 2.7261: Install timers and/or thermostats $374 $222 $369
11,137
kWh
- $5 - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $5,136 $1,500 - - - $5,136
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,282 $2,577 $833
25,205
kWh
$430
-
kW-mo/yr
$19 - - -
07 2.7241: Install outside air damper / economizer on hvac unit $8,552 $18,900 $8,426
253,517
kWh
- $126 - - -
08 3.6124: Burn waste oil for heat $614 $2,274 - - - $114
-
MMBtu
$500
-
gal
-
09 4.821: Pay bills on time to avoid late fees $12,122 $100 - - - - - $12,122
10 4.821: Pay bills on time to avoid late fees $13,641 $2,100 - - - - - $13,641
TOTAL RECOMMENDED $54,629 $60,439 $21,465
646,541
kWh
$1,310
-
kW-mo/yr
$341 $5,250
-
MMBtu
$500
-
gal
$25,763
TOTAL IMPLEMENTED $30,899 $3,700 - - - $5,136
-
MMBtu
- $25,763
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs