ITAC Assessment: MS0125
ITAC logo
ITAC Assessment: MS0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Prepared Poultry
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 37,800
ft2
Annual Production 20,800,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,680 2,938,746
kWh
Electricity Demand $28,623 6,365
kW-mo/yr
Electricity Fees $(-14,507.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,761 $6,971 $2,697
85,580
kWh
$531
-
kW-mo/yr
$(-467.0) - - - -
02 2.2437: Recover waste heat from equipment $2,888 $3,952 - - - $2,888
-
MMBtu
- - -
03 2.7261: Install timers and/or thermostats $125 $236 $151
4,689
kWh
- $(-26.0) - - - -
04 3.1161: Eliminate/reduce an operation $3,255 - - - - - - $477 $2,778
05 3.4151: Minimize water usage $279 $10 - - - - $279
-
Tgal
- -
06 4.652: Replace existing equipment with more suitable substitutes $5,878 $14,990 $1,246
47,773
kWh
$342
-
kW-mo/yr
- - - $1,080 $3,210
07 4.821: Pay bills on time to avoid late fees $813 $324 - - $813 - - - -
TOTAL RECOMMENDED $15,999 $26,483 $4,094
138,042
kWh
$873
-
kW-mo/yr
$320 $2,888
-
MMBtu
$279
-
Tgal
$1,557 $5,988
TOTAL IMPLEMENTED $7,233 $7,541 $2,848
90,269
kWh
$531
-
kW-mo/yr
$320 - $279
-
Tgal
$477 $2,778
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs