ITAC Assessment: MS0123
ITAC logo
ITAC Assessment: MS0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wood Household Furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 452,858
ft2
Annual Production 55,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,416 2,620,164
kWh
Electricity Demand $105,088 12,932
kW-mo/yr
Electricity Fees $15,111 -
Natural Gas $38,650 7,724
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4238: Do not use compressed air for personal cooling $1,920 $1,520 $1,892
53,341
kWh
$28 - - -
02 2.7231: Use radiant heater for spot heating $7,783 $9,763 - - $7,783
-
MMBtu
- -
03 2.7313: Recycle air for heating, ventilation and air conditioning $3,682 $13,606 - - $3,682
-
MMBtu
- -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,528 $1,892 $1,506
42,497
kWh
$22 - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,576 $389 $1,553
43,669
kWh
$23 - - -
06 2.3212: Optimize plant power factor $11,310 $10,800 - $11,310 - - -
07 2.7261: Install timers and/or thermostats $4,448 $1,888 $4,382
123,388
kWh
$66 - - -
08 3.6123: Burn wood by-products for heat $16,438 $80,000 - - $3,298
-
MMBtu
$13,140
-
lb
-
09 4.812: Apply for investment incentives $110 $25 - - - - $110
TOTAL RECOMMENDED $48,795 $119,883 $9,333
262,895
kWh
$11,449 $14,763
-
MMBtu
$13,140
-
lb
$110
TOTAL IMPLEMENTED $27,147 $24,385 $7,827
220,398
kWh
$11,427 $7,783
-
MMBtu
- $110
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs