ITAC Assessment: OR0126
ITAC logo
ITAC Assessment: OR0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DIMENSIONAL LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area
n/a
Annual Production 52,500
thousand feet
Production Hrs. Annual 3,640
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,560 4,632,767
kWh
Wood $80,762 64,610
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,444 - $1,113
27,257
kWh
- $331
02 2.7142: Utilize higher efficiency lamps and/or ballasts $679 - $778
20,809
kWh
- $(-99.0)
03 2.2511: Insulate bare equipment $3,443 $2,519 - $3,443
-
MMBtu
-
04 2.2123: Insulate feedwater tank $407 $356 - $407
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,690 $2,500 $1,690
38,687
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,283 $27,444 $10,283
313,599
kWh
- -
07 2.4133: Use most efficient type of electric motors $278 $773 $278
5,862
kWh
- -
TOTAL RECOMMENDED $18,224 $33,592 $14,142
406,214
kWh
$3,850
-
MMBtu
$232
TOTAL IMPLEMENTED $18,224 $33,592 $14,142
406,214
kWh
$3,850
-
MMBtu
$232
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs