| Assessment Year | 1991 |
|---|---|
| Principal Product | DIMENSIONAL LUMBER |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $10 M to 50M |
| # of Employees | 85 |
| Plant Area |
n/a
|
| Annual Production | 52,500
thousand feet
|
| Production Hrs. Annual | 3,640
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $199,560 | 4,632,767 |
kWh
|
$0.043 |
| Wood | $80,762 | 64,610 |
MMBtu
|
$1.25 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,224 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,224 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $1,444 | - |
$1,113
27,257
kWh
|
- | $331 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $679 | - |
$778
20,809
kWh
|
- | $(-99.0) | |
| 03 | 2.2511: Insulate bare equipment | $3,443 | $2,519 | - |
$3,443
-
MMBtu
|
- | |
| 04 | 2.2123: Insulate feedwater tank | $407 | $356 | - |
$407
-
MMBtu
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,690 | $2,500 |
$1,690
38,687
kWh
|
- | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,283 | $27,444 |
$10,283
313,599
kWh
|
- | - | |
| 07 | 2.4133: Use most efficient type of electric motors | $278 | $773 |
$278
5,862
kWh
|
- | - | |
| TOTAL RECOMMENDED | $18,224 | $33,592 |
$14,142
406,214
kWh
|
$3,850
-
MMBtu
|
$232 | ||
| TOTAL IMPLEMENTED | $18,224 | $33,592 |
$14,142
406,214
kWh
|
$3,850
-
MMBtu
|
$232 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs