Assessment Year | 1991 |
---|---|
Principal Product | DIMENSIONAL LUMBER |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
n/a
|
Annual Production | 52,500
thousand feet
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $199,560 | 4,632,767 |
kWh
|
$0.043 |
Wood | $80,762 | 64,610 |
MMBtu
|
$1.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,224 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,224 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,444 | - |
$1,113
27,257
kWh
|
- | $331 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $679 | - |
$778
20,809
kWh
|
- | $(-99.0) | |
03 | 2.2511: Insulate bare equipment | $3,443 | $2,519 | - |
$3,443
-
MMBtu
|
- | |
04 | 2.2123: Insulate feedwater tank | $407 | $356 | - |
$407
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,690 | $2,500 |
$1,690
38,687
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,283 | $27,444 |
$10,283
313,599
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $278 | $773 |
$278
5,862
kWh
|
- | - | |
TOTAL RECOMMENDED | $18,224 | $33,592 |
$14,142
406,214
kWh
|
$3,850
-
MMBtu
|
$232 | ||
TOTAL IMPLEMENTED | $18,224 | $33,592 |
$14,142
406,214
kWh
|
$3,850
-
MMBtu
|
$232 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs