ITAC Assessment: MS0108
ITAC logo
ITAC Assessment: MS0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Bathtubs
NAICS
n/a
SIC 3088: Plastics Plumbing Fixtures
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 240,000
ft2
Annual Production 37,500
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,303 1,028,136
kWh
Electricity Demand $38,797 8,185
kW-mo/yr
Electricity Fees $19,326 -
Natural Gas $59,936 9,405
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $184,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,917 $3,506 $1,463
31,946
kWh
$905
-
kW-mo/yr
$549 - -
02 2.7261: Install timers and/or thermostats $567 $696 $418
9,086
kWh
- $149 - -
03 2.7134: Use photocell controls $3,078 $759 $2,272
49,238
kWh
- $806 - -
04 2.8114: Change rate schedules or other changes in utility service $1,485 - - - $1,485 - -
05 2.2511: Insulate bare equipment $3,162 $8,391 $2,334
50,703
kWh
- $828 - -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $173,662 $4,130 - - - $170,962
-
lb
$2,700
-
lb
TOTAL RECOMMENDED $184,871 $17,482 $6,487
140,973
kWh
$905
-
kW-mo/yr
$3,817 $170,962
-
lb
$2,700
-
lb
TOTAL IMPLEMENTED $1,485 - - - $1,485 - -