ITAC Assessment: MO0191
ITAC logo
ITAC Assessment: MO0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Chemical Instant Ice Packs, Instant Hot Packs
NAICS
n/a
SIC 2813: Industrial Gases
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 45,000
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,822 939,625
kWh
Electricity Demand $5,943 2,967
kW-mo/yr
Natural Gas $2,025 352
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,604

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.441: Install automatic packing equipment $47,917 $136,000 - - $2,017
-
lb
$45,900 -
02 3.7198: Reduce / eliminate use of disposable product $3,620 $625 - - - - $3,620
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,247 $80 $2,139
37,222
kWh
$108
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $2,490 $250 $2,371
41,325
kWh
$119
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,274 $5,576 $2,084
36,342
kWh
$190
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,556 $1,410 $1,442
25,205
kWh
$114
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $120 - $116
2,052
kWh
$4
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $60,224 $143,941 $8,152
142,146
kWh
$535
-
kW-mo/yr
$2,017
-
lb
$45,900 $3,620
TOTAL IMPLEMENTED $56,604 $143,316 $8,152
142,146
kWh
$535
-
kW-mo/yr
$2,017
-
lb
$45,900 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs