| Assessment Year | 1998 |
|---|---|
| Principal Product | Mufflers |
| NAICS |
n/a
|
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $50 M to 100M |
| # of Employees | 500 |
| Plant Area |
278,000
ft2
|
| Annual Production | 3,500,000
pieces
|
| Production Hrs. Annual | 3,920
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $387,880 | 11,083,822 |
kWh
|
$0.035 |
| Electricity Demand | $299 | 63 |
kW-mo/yr
|
$4.75 |
| Electricity Fees | $138,007 | - |
|
- |
| Natural Gas | $10,630 | 1,919 |
MMBtu
|
$5.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $129,392 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $117,151 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4314: Use synthetic lubricant | $951 | $239 |
$747
19,637
kWh
|
$204 | - | - | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,645 | $8,030 |
$2,642
69,754
kWh
|
$1,003 | - | - | - | |
| 03 | 2.7261: Install timers and/or thermostats | $1,060 | $1,206 |
$758
21,102
kWh
|
$302 | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,365 | $2,376 |
$4,614
121,923
kWh
|
$1,751 | - | - | - | |
| 05 | 3.6124: Burn waste oil for heat | $8,596 | $5,256 | - | - |
$2,731
-
MMBtu
|
$5,865
-
gal
|
- | |
| 06 | 4.431: Train operators for maximum operating efficiency | $108,775 | - |
$1,915
104,924
kWh
|
$1,020 | - | - | $105,840 | |
| TOTAL RECOMMENDED | $129,392 | $17,107 |
$10,676
337,340
kWh
|
$4,280 |
$2,731
-
MMBtu
|
$5,865
-
gal
|
$105,840 | ||
| TOTAL IMPLEMENTED | $117,151 | $3,821 |
$8,034
267,586
kWh
|
$3,277 | - | - | $105,840 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs