ITAC Assessment: MS0102
ITAC logo
ITAC Assessment: MS0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product textile felts
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 172
Plant Area 250,000
ft2
Annual Production 720,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $381,740 12,138,042
kWh
Electricity Demand $234,606 24,274
kW-mo/yr
Electricity Fees $9,356 -
Natural Gas $170,652 47,895
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $596,085 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $554,157

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $22,934 $8,025 - - $22,934 - - -
02 2.6218: Turn off equipment when not in use $16,041 - $11,127
353,751
kWh
$4,914
-
kW-mo/yr
- - - -
03 2.7124: Make a practice of turning off lights when not needed $3,038 $1,930 $3,038
96,717
kWh
- - - - -
04 2.2211: Use optimum temperature $17,981 - - - - $17,981
-
MMBtu
- -
05 2.2164: Turn off steam tracing during mild weather $5,726 - - - - $5,726
-
MMBtu
- -
06 2.7261: Install timers and/or thermostats $7,306 $47 - - - $7,306
-
MMBtu
- -
07 2.2437: Recover waste heat from equipment $4,227 $8,447 - - - $4,227
-
MMBtu
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,767 $22,372 $14,767
469,519
kWh
- - - - -
09 3.5313: Increase amount of waste recovered for resale $7,369 - - - - - $7,369
-
lb
-
10 3.5315: Lease / purchase baler; sell cardboard to recycler $7,480 $6,500 - - - - $7,480
-
lb
-
11 4.452: Eliminate shift $489,216 - - - - - - $489,216
TOTAL RECOMMENDED $596,085 $47,321 $28,932
919,987
kWh
$4,914
-
kW-mo/yr
$22,934 $35,240
-
MMBtu
$14,849
-
lb
$489,216
TOTAL IMPLEMENTED $554,157 $8,477 $14,165
450,468
kWh
$4,914
-
kW-mo/yr
- $31,013
-
MMBtu
$14,849
-
lb
$489,216
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs