ITAC Assessment: MS0100
ITAC logo
ITAC Assessment: MS0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Foam
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 369,000
ft2
Annual Production 144,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,840 3,250,879
kWh
Electricity Demand $73,091 8,382
kW-mo/yr
Electricity Fees $2,609 -
Natural Gas $21,037 4,069
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $393 $688 $393
12,603
kWh
- - - -
02 2.7111: Reduce illumination to minimum necessary levels $2,900 $130 $1,782
57,444
kWh
$1,118
-
kW-mo/yr
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $2,509 $6,600 - - $2,509
-
MMBtu
- -
04 2.2437: Recover waste heat from equipment $11,663 $4,770 - - $11,663
-
MMBtu
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $7,250 $6,500 - - - - $7,250
06 4.322: Eliminate old stock and modify inventory control $27,581 $3,182 - - - $16,911 $10,670
TOTAL RECOMMENDED $52,296 $21,870 $2,175
70,047
kWh
$1,118
-
kW-mo/yr
$14,172
-
MMBtu
$16,911 $17,920
TOTAL IMPLEMENTED $49,787 $15,270 $2,175
70,047
kWh
$1,118
-
kW-mo/yr
$11,663
-
MMBtu
$16,911 $17,920
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs