ITAC Assessment: MS0092
ITAC logo
ITAC Assessment: MS0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product laminated products
NAICS
n/a
SIC 2641:
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 110,000
ft2
Annual Production 85,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,324 5,320,926
kWh
Electricity Demand $55,757 12,990
kW-mo/yr
Electricity Fees $(-15,570.0) -
Natural Gas $59,757 15,265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $6,178 $1,863 n/a - - - $6,178
-
MMBtu
- -
02 2.4221: Install compressor air intakes in coolest locations $420 $364 n/a $394
12,016
kWh
$98
-
kW-mo/yr
$(-72.0) - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,733 $4,351 n/a $1,444
44,256
kWh
$565
-
kW-mo/yr
$(-276.0) - - -
04 2.3212: Optimize plant power factor $19,015 $33,000 n/a - $19,015
-
kW-mo/yr
- - - -
05 2.4226: Use / purchase optimum sized compressor $3,493 - n/a $3,267
100,234
kWh
$825
-
kW-mo/yr
$(-599.0) - - -
06 3.3131: Use evaporation to concentrate material $7,975 $10,000 n/a - - - - $7,975
-
gal
-
07 3.6192: Use a less expensive method of waste removal $6,093 - n/a - - - - - $6,093
TOTAL RECOMMENDED $44,907 $49,578 $5,105
156,506
kWh
$20,503
-
kW-mo/yr
$(-947.0) $6,178
-
MMBtu
$7,975
-
gal
$6,093
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs