| Assessment Year | 1997 |
|---|---|
| Principal Product | laminated products |
| NAICS |
n/a
|
| SIC | 2641: |
| Sales Range | $10 M to 50M |
| # of Employees | 88 |
| Plant Area |
110,000
ft2
|
| Annual Production | 85,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $207,324 | 5,320,926 |
kWh
|
$0.039 |
| Electricity Demand | $55,757 | 12,990 |
kW-mo/yr
|
$4.29 |
| Electricity Fees | $(-15,570.0) | - |
|
- |
| Natural Gas | $59,757 | 15,265 |
MMBtu
|
$3.91 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,907 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $6,178 | $1,863 | n/a | - | - | - |
$6,178
-
MMBtu
|
- | - |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $420 | $364 | n/a |
$394
12,016
kWh
|
$98
-
kW-mo/yr
|
$(-72.0) | - | - | - |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,733 | $4,351 | n/a |
$1,444
44,256
kWh
|
$565
-
kW-mo/yr
|
$(-276.0) | - | - | - |
| 04 | 2.3212: Optimize plant power factor | $19,015 | $33,000 | n/a | - |
$19,015
-
kW-mo/yr
|
- | - | - | - |
| 05 | 2.4226: Use / purchase optimum sized compressor | $3,493 | - | n/a |
$3,267
100,234
kWh
|
$825
-
kW-mo/yr
|
$(-599.0) | - | - | - |
| 06 | 3.3131: Use evaporation to concentrate material | $7,975 | $10,000 | n/a | - | - | - | - |
$7,975
-
gal
|
- |
| 07 | 3.6192: Use a less expensive method of waste removal | $6,093 | - | n/a | - | - | - | - | - | $6,093 |
| TOTAL RECOMMENDED | $44,907 | $49,578 |
$5,105
156,506
kWh
|
$20,503
-
kW-mo/yr
|
$(-947.0) |
$6,178
-
MMBtu
|
$7,975
-
gal
|
$6,093 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs