ITAC Assessment: MS0078
ITAC logo
ITAC Assessment: MS0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product hydraulic cylinders
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $5
M
to 10
M
# of Employees 103
Plant Area 85,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,706 1,997,655
kWh
Electricity Demand $32,590 5,376
kW-mo/yr
Electricity Fees $8,212 -
Natural Gas $11,569 1,740
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,085

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings By-product Production Savings
01 2.2424: Use heat in flue gases to preheat products or materials $2,069 $470 - - $2,069
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,291 $3,272 $841
19,930
kWh
$450
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $3,744 $3,000 - $3,744
-
kW-mo/yr
- - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,932 $6,905 $6,262
147,421
kWh
$3,600
-
kW-mo/yr
$(-3,930.0)
-
MMBtu
- -
05 2.6218: Turn off equipment when not in use $2,225 $200 $2,225
52,462
kWh
- - - -
06 3.6124: Burn waste oil for heat $790 $1,995 - - $790
-
MMBtu
- -
07 3.5248: Separate and recycle scrap metal to foundry or for sale $81,746 $22,500 - - - - $81,746
08 4.446: Automate finishing process $18,500 $20,000 - - - $18,500 -
TOTAL RECOMMENDED $116,297 $58,342 $9,328
219,813
kWh
$7,794
-
kW-mo/yr
$(-1,071.0)
-
MMBtu
$18,500 $81,746
TOTAL IMPLEMENTED $24,085 $23,942 $3,066
72,392
kWh
$450
-
kW-mo/yr
$2,069
-
MMBtu
$18,500 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs