ITAC Assessment: MS0075
ITAC logo
ITAC Assessment: MS0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Wood Working Equipment
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $50
M
to 100
M
# of Employees 290
Plant Area 330,000
ft2
Annual Production 61,000,000
lb
Production Hrs. Annual 4,150
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,723 10,307,738
kWh
Electricity Demand $225,625 26,226
kW-mo/yr
Electricity Fees $8,795 -
Natural Gas $84,143 24,674
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $43,335 $94,398 $20,694
669,402
kWh
$22,641
-
kW-mo/yr
- - - -
02 2.2437: Recover waste heat from equipment $4,676 $5,365 - - $4,676
-
MMBtu
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $3,115 $3,350 - - $3,115
-
MMBtu
- - -
04 2.7261: Install timers and/or thermostats $1,733 $1,624 $1,733
55,979
kWh
- - - - -
05 3.8132: Use less toxic and volatile solvent substitutes $7,248 - - - - $10,082
-
gal
$(-2,881.0) $47
TOTAL RECOMMENDED $60,107 $104,737 $22,427
725,381
kWh
$22,641
-
kW-mo/yr
$7,791
-
MMBtu
$10,082
-
gal
$(-2,881.0) $47
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs