ITAC Assessment: MS0059
ITAC logo
ITAC Assessment: MS0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product copper tube
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 172
Plant Area 151,391
ft2
Annual Production 16,900,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,190 15,406,214
kWh
Electricity Demand $216,232 34,692
kW-mo/yr
Electricity Fees $55,674 -
Natural Gas $133,673 33,281
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $168,866 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,347

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $6,983 $2,422 - - $6,983
-
MMBtu
- - - -
02 2.1133: Adjust burners for efficient operation $26,347 $1,000 - - $26,347
-
MMBtu
- - - -
03 2.3212: Optimize plant power factor $9,183 $18,000 - $9,183 - - - - -
04 2.7261: Install timers and/or thermostats $1,807 $1,160 $612
28,429
kWh
- $1,195
-
MMBtu
- - - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $35,986 $23,018 - - $(-4,852.0)
-
MMBtu
- - $40,838
-
gal
-
06 3.8132: Use less toxic and volatile solvent substitutes $88,560 - - - - $(-11.0)
-
Tgal
$13,704
-
gal
$26,479
-
gal
$48,388
TOTAL RECOMMENDED $168,866 $45,600 $612
28,429
kWh
$9,183 $29,673
-
MMBtu
$(-11.0)
-
Tgal
$13,704
-
gal
$67,317
-
gal
$48,388
TOTAL IMPLEMENTED $26,347 $1,000 - - $26,347
-
MMBtu
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs