ITAC Assessment: MS0049
ITAC logo
ITAC Assessment: MS0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product wiring harnesses
NAICS
n/a
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $50
M
to 100
M
# of Employees 530
Plant Area 55,000
ft2
Annual Production 360,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,204 2,209,848
kWh
Electricity Demand $45,794 5,359
kW-mo/yr
Electricity Fees $2,317 -
LPG $1,432 267
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $441,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,933 $6,695 $2,379
78,546
kWh
$2,554
-
kW-mo/yr
- - - -
02 2.7261: Install timers and/or thermostats $1,936 $5,000 $1,936
63,892
kWh
- - - - -
03 2.7261: Install timers and/or thermostats $790 $570 $790
26,084
kWh
- - - - -
04 2.7111: Reduce illumination to minimum necessary levels $1,838 $80 $924
30,481
kWh
$914
-
kW-mo/yr
- - - -
05 2.7227: Use water on air conditioning exchanger to improve heat transfer and increase air conditioner efficiency $2,389 $5,280 $1,519
50,117
kWh
$870
-
kW-mo/yr
- - - -
06 2.3212: Optimize plant power factor $1,144 $900 - - $1,144 - - -
07 3.1191: Change procedures / equipment / operating conditions $428,130 $50,000 - - - $(-30,870.0)
-
lb
$(-45,000.0) $504,000
TOTAL RECOMMENDED $441,160 $68,525 $7,548
249,120
kWh
$4,338
-
kW-mo/yr
$1,144 $(-30,870.0)
-
lb
$(-45,000.0) $504,000
TOTAL IMPLEMENTED $7,659 $12,265 $5,105
168,522
kWh
$2,554
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs