ITAC Assessment: MS0048
ITAC logo
ITAC Assessment: MS0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Office partitions
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 257,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,407 4,752,052
kWh
Electricity Demand $138,893 15,524
kW-mo/yr
Electricity Fees $(-50,066.0) -
Natural Gas $37,047 12,038
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,011

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $4,277 $3,000 - - $4,277 - - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $16,746 $10,140 $8,450
272,274
kWh
$11,664
-
kW-mo/yr
- $(-3,368.0)
-
MMBtu
- - -
03 2.2514: Cover open tanks $127 $304 - - - $127
-
MMBtu
- - -
04 2.4314: Use synthetic lubricant $2,734 $400 $975
31,360
kWh
$1,759
-
kW-mo/yr
- - - - -
05 2.2414: Use waste heat from hot flue gases to preheat $2,749 $1,440 - - - $2,749
-
MMBtu
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,099 $300 $390
12,603
kWh
$709
-
kW-mo/yr
- - - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $11,000 $6,500 - - - - - $11,000
-
lb
-
08 3.8142: Distill contaminated solvents for reuse $14,802 - $(-172.0)
(-5,569)
kWh
$(-117.0)
-
kW-mo/yr
- - $17,691
-
gal
- $(-2,600.0)
TOTAL RECOMMENDED $53,534 $22,084 $9,643
310,668
kWh
$14,015
-
kW-mo/yr
$4,277 $(-492.0)
-
MMBtu
$17,691
-
gal
$11,000
-
lb
$(-2,600.0)
TOTAL IMPLEMENTED $7,011 $3,400 $975
31,360
kWh
$1,759
-
kW-mo/yr
$4,277 - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs