| Assessment Year | 1996 |
|---|---|
| Principal Product | Office partitions |
| NAICS |
n/a
|
| SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
| Sales Range | $50 M to 100M |
| # of Employees | 125 |
| Plant Area |
257,000
ft2
|
| Annual Production | 200,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $147,407 | 4,752,052 |
kWh
|
$0.031 |
| Electricity Demand | $138,893 | 15,524 |
kW-mo/yr
|
$8.95 |
| Electricity Fees | $(-50,066.0) | - |
|
- |
| Natural Gas | $37,047 | 12,038 |
MMBtu
|
$3.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $53,534 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,011 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $4,277 | $3,000 | - | - | $4,277 | - | - | - | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $16,746 | $10,140 |
$8,450
272,274
kWh
|
$11,664
-
kW-mo/yr
|
- |
$(-3,368.0)
-
MMBtu
|
- | - | - | |
| 03 | 2.2514: Cover open tanks | $127 | $304 | - | - | - |
$127
-
MMBtu
|
- | - | - | |
| 04 | 2.4314: Use synthetic lubricant | $2,734 | $400 |
$975
31,360
kWh
|
$1,759
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $2,749 | $1,440 | - | - | - |
$2,749
-
MMBtu
|
- | - | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,099 | $300 |
$390
12,603
kWh
|
$709
-
kW-mo/yr
|
- | - | - | - | - | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $11,000 | $6,500 | - | - | - | - | - |
$11,000
-
lb
|
- | |
| 08 | 3.8142: Distill contaminated solvents for reuse | $14,802 | - |
$(-172.0)
(-5,569)
kWh
|
$(-117.0)
-
kW-mo/yr
|
- | - |
$17,691
-
gal
|
- | $(-2,600.0) | |
| TOTAL RECOMMENDED | $53,534 | $22,084 |
$9,643
310,668
kWh
|
$14,015
-
kW-mo/yr
|
$4,277 |
$(-492.0)
-
MMBtu
|
$17,691
-
gal
|
$11,000
-
lb
|
$(-2,600.0) | ||
| TOTAL IMPLEMENTED | $7,011 | $3,400 |
$975
31,360
kWh
|
$1,759
-
kW-mo/yr
|
$4,277 | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs