ITAC Assessment: MS0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Electroplated Metal Components
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area 37,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,960 889,215
kWh
Natural Gas $2,209 510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $1,444 $3,310 - $1,444
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $783 $1,219 $783
10,258
kWh
-
03 2.2514: Cover open tanks $627 $666 $627
19,637
kWh
-
04 2.6218: Turn off equipment when not in use $2,512 $440 $2,512
78,253
kWh
-
05 2.4314: Use synthetic lubricant $225 $20 $225
2,931
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $96 $100 $96
1,172
kWh
-
TOTAL RECOMMENDED $5,687 $5,755 $4,243
112,251
kWh
$1,444
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs