ITAC Assessment: CO0509
ITAC logo
ITAC Assessment: CO0509
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Mining conveyor idlers
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 88,500
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,989 837,000
kWh
Electricity Demand $29,629 3,536
kW-mo/yr
Electricity Fees $1,245 -
Natural Gas $7,658 1,379
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,910

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $2,920 $8,000 - $2,920
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,620 $230 $950
31,800
kWh
$1,450
-
kW-mo/yr
- $(-780.0) -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $640 $2,260 $250
8,500
kWh
$390
-
kW-mo/yr
- - -
04 2.7141: Lower light fixtures in high ceiling areas $610 $1,920 $240
8,100
kWh
$370
-
kW-mo/yr
- - -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $17,700 $2,000 - - $1,890
-
lb
- $15,810
06 3.2176: Increase use of automation $9,140 $1,600 - - $540
-
lb
- $8,600
07 3.3122: Use filtration, centrifuging to remove contaminants $2,450 $1,330 - - - - $2,450
TOTAL RECOMMENDED $35,080 $17,340 $1,440
48,400
kWh
$5,130
-
kW-mo/yr
$2,430
-
lb
$(-780.0) $26,860
TOTAL IMPLEMENTED $30,910 $5,160 $950
31,800
kWh
$1,450
-
kW-mo/yr
$2,430
-
lb
$(-780.0) $26,860
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs