| Assessment Year | 1995 |
|---|---|
| Principal Product | Furniture |
| NAICS |
n/a
|
| SIC | 2521: Wood Office Furniture |
| Sales Range | $10 M to 50M |
| # of Employees | 344 |
| Plant Area |
280,000
ft2
|
| Annual Production | 150,000
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,135 | 2,080,012 |
kWh
|
$0.060 |
| Natural Gas | $9,205 | 1,683 |
MMBtu
|
$5.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $28,389 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $1,849 | $200 | n/a |
$1,849
21,688
kWh
|
- | - |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,785 | - | n/a | - | - | $5,785 |
| 03 | 2.2437: Recover waste heat from equipment | $593 | $2,820 | n/a | - |
$593
-
MMBtu
|
- |
| 04 | 2.7229: Air condition only space necessary | $11,011 | $10,635 | n/a |
$6,211
204,865
kWh
|
- | $4,800 |
| 05 | 2.7227: Use water on air conditioning exchanger to improve heat transfer and increase air conditioner efficiency | $7,392 | $7,500 | n/a |
$1,392
24,326
kWh
|
- | $6,000 |
| 06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $989 | $760 | n/a |
$1,443
12,603
kWh
|
$(-454.0)
-
MMBtu
|
- |
| 07 | 2.7314: Reduce ventilation air | $536 | $200 | n/a |
$536
17,585
kWh
|
- | - |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $234 | $202 | n/a |
$234
2,345
kWh
|
- | - |
| TOTAL RECOMMENDED | $28,389 | $22,317 |
$11,665
283,412
kWh
|
$139
-
MMBtu
|
$16,585 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs