Assessment Year | 1995 |
---|---|
Principal Product | Furniture |
NAICS |
n/a
|
SIC | 2521: Wood Office Furniture |
Sales Range | $10 M to 50M |
# of Employees | 344 |
Plant Area |
280,000
ft2
|
Annual Production | 150,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $124,135 | 2,080,012 |
kWh
|
$0.060 |
Natural Gas | $9,205 | 1,683 |
MMBtu
|
$5.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,389 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,849 | $200 | n/a |
$1,849
21,688
kWh
|
- | - |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,785 | - | n/a | - | - | $5,785 |
03 | 2.2437: Recover waste heat from equipment | $593 | $2,820 | n/a | - |
$593
-
MMBtu
|
- |
04 | 2.7229: Air condition only space necessary | $11,011 | $10,635 | n/a |
$6,211
204,865
kWh
|
- | $4,800 |
05 | 2.7227: Use water on air conditioning exchanger to improve heat transfer and increase air conditioner efficiency | $7,392 | $7,500 | n/a |
$1,392
24,326
kWh
|
- | $6,000 |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $989 | $760 | n/a |
$1,443
12,603
kWh
|
$(-454.0)
-
MMBtu
|
- |
07 | 2.7314: Reduce ventilation air | $536 | $200 | n/a |
$536
17,585
kWh
|
- | - |
08 | 2.4221: Install compressor air intakes in coolest locations | $234 | $202 | n/a |
$234
2,345
kWh
|
- | - |
TOTAL RECOMMENDED | $28,389 | $22,317 |
$11,665
283,412
kWh
|
$139
-
MMBtu
|
$16,585 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs