ITAC Assessment: AT0088
ITAC logo
ITAC Assessment: AT0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MOLDED RUBBER PRODUCTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,485 1,212,778
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,690 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4312: Improve lubrication practices $2,632 - $2,632
43,962
kWh
02 2.4133: Use most efficient type of electric motors $366 $307 $366
6,155
kWh
03 2.7226: Use computer programs to optimize hvac performance $802 $1,500 $802
13,482
kWh
04 2.2511: Insulate bare equipment $854 $800 $854
14,361
kWh
05 2.7229: Air condition only space necessary $1,720 $5,000 $1,720
28,722
kWh
06 2.7221: Lower temperature during the winter season and vice-versa $316 $500 $316
5,275
kWh
TOTAL RECOMMENDED $6,690 $8,107 $6,690
111,957
kWh
TOTAL IMPLEMENTED $4,058 $8,107 $4,058
67,995
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs