ITAC Assessment: MS0039
ITAC logo
ITAC Assessment: MS0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Motion Furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 270,000
ft2
Annual Production 90,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,126 1,596,131
kWh
Natural Gas $7,225 1,721
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,931

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $624 $321 $624
9,086
kWh
-
02 2.2437: Recover waste heat from equipment $990 $2,930 - $990
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,508 $10,000 $6,508
84,115
kWh
-
04 2.7227: Use water on air conditioning exchanger to improve heat transfer and increase air conditioner efficiency $3,551 $16,800 $3,551
60,082
kWh
-
05 2.7134: Use photocell controls $434 $260 $434
13,482
kWh
-
06 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,365 $3,000 $2,365
73,564
kWh
-
TOTAL RECOMMENDED $14,472 $33,311 $13,482
240,329
kWh
$990
-
MMBtu
TOTAL IMPLEMENTED $9,931 $13,581 $9,931
180,247
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs