ITAC Assessment: MS0038
ITAC logo
ITAC Assessment: MS0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Heating Coils
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $50
M
to 100
M
# of Employees 464
Plant Area 186,000
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $554,144 12,827,374
kWh
Natural Gas $34,893 6,187
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7124: Make a practice of turning off lights when not needed $2,481 $1,400 $2,481
97,597
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,552 $5,300 $1,552
44,549
kWh
03 2.2437: Recover waste heat from equipment $30,745 $1,300 $30,745
873,974
kWh
04 2.2514: Cover open tanks $276 $420 $276
10,844
kWh
05 2.2437: Recover waste heat from equipment $5,273 $10,121 $5,273
97,304
kWh
06 2.7444: Close holes and openings in building such as broken windows $147 $140 $147
5,862
kWh
TOTAL RECOMMENDED $40,474 $18,681 $40,474
1,130,130
kWh
TOTAL IMPLEMENTED $2,628 $1,540 $2,628
103,459
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs