ITAC Assessment: MS0036
ITAC logo
ITAC Assessment: MS0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Gloves
NAICS
n/a
SIC 2381: Dress and Work Gloves, Except Knit and All-Leather
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 50,680
ft2
Annual Production 19,200,000
pieces
Production Hrs. Annual 1,728
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,894 731,829
kWh
Natural Gas $4,072 966
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,502

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $156 $142 $156
2,052
kWh
-
02 2.2437: Recover waste heat from equipment $1,060 $1,510 - $1,060
-
MMBtu
03 2.7135: Install occupancy sensors $175 $380 $175
5,569
kWh
-
04 2.2625: Chill water to the highest temperature possible $3,275 $800 $2,475
20,516
kWh
$800
-
MMBtu
05 2.4314: Use synthetic lubricant $442 $75 $442
5,569
kWh
-
TOTAL RECOMMENDED $5,108 $2,907 $3,248
33,706
kWh
$1,860
-
MMBtu
TOTAL IMPLEMENTED $1,502 $1,585 $442
5,569
kWh
$1,060
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs