ITAC Assessment: UM0132
ITAC logo
ITAC Assessment: UM0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Coated Plastic Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 102
Plant Area 80,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,026 649,179
kWh
Electricity Demand $59,521 5,292
kW-mo/yr
Electricity Fees $406 -
Natural Gas $32,469 9,846
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,280 $7,301 $1,897
32,825
kWh
$2,383
-
kW-mo/yr
- - - -
02 2.7243: Improve air circulation with destratification fans / other methods $680 $700 - - $680
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $667 $300 $269
4,689
kWh
$398
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $349 $1,000 $134
2,345
kWh
$215
-
kW-mo/yr
- - - -
05 2.2437: Recover waste heat from equipment $815 $990 - - $815
-
MMBtu
- - -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $13,503 $3,700 - - - $1,503
-
lb
- $12,000
07 3.8135: Use low voc or water based paint $5,439 $500 - - - - - $5,439
08 4.111: Add equipment/ operators to reduce production bottleneck $53,333 $1,548 - - - - $53,333 -
TOTAL RECOMMENDED $79,066 $16,039 $2,300
39,859
kWh
$2,996
-
kW-mo/yr
$1,495
-
MMBtu
$1,503
-
lb
$53,333 $17,439
TOTAL IMPLEMENTED $25,733 $14,491 $2,300
39,859
kWh
$2,996
-
kW-mo/yr
$1,495
-
MMBtu
$1,503
-
lb
- $17,439
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs