ITAC Assessment: MS0011
ITAC logo
ITAC Assessment: MS0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Commercial Furniture
NAICS
n/a
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 115,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,921 2,538,101
kWh
Natural Gas $46,320 11,507
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,752

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6218: Turn off equipment when not in use $71,302 $2,000 $71,302
2,344,666
kWh
02 2.6231: Utilize controls to operate equipment only when needed $4,752 $1,200 $4,752
158,265
kWh
03 2.3212: Optimize plant power factor $6,195 $9,840 $6,195
-
kWh
04 2.4133: Use most efficient type of electric motors $5,244 $13,000 $5,244
109,906
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,962 $5,333 $1,962
44,842
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $206 $102 $206
2,931
kWh
TOTAL RECOMMENDED $89,661 $31,475 $89,661
2,660,610
kWh
TOTAL IMPLEMENTED $76,752 $15,102 $76,752
2,457,503
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs