ITAC Assessment: MS0010
ITAC logo
ITAC Assessment: MS0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product furniture frames
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 250,000
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $431,113 7,395,956
kWh
Natural Gas $979 185
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $130,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,872

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3134: Shift from daytime to nighttime operation $61,508 - $61,508
-
kWh
02 2.6231: Utilize controls to operate equipment only when needed $23,650 $90,000 $23,650
279,894
kWh
03 2.1213: Direct warmest air to combustion intake $13,523 $50,000 $13,523
160,023
kWh
04 2.2163: Use minimum steam operating pressure $8,352 $6,000 $8,352
99,941
kWh
05 2.2121: Increase amount of condensate returned $7,545 $15,000 $7,545
184,642
kWh
06 2.3191: Use demand controller or load shedder $5,325 $3,000 $5,325
-
kWh
07 2.6231: Utilize controls to operate equipment only when needed $4,488 $3,500 $4,488
149,766
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,182 $1,991 $4,182
47,773
kWh
09 2.7111: Reduce illumination to minimum necessary levels $1,690 - $1,690
19,930
kWh
TOTAL RECOMMENDED $130,263 $169,491 $130,263
941,969
kWh
TOTAL IMPLEMENTED $5,872 $1,991 $5,872
67,703
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs