| Assessment Year | 1994 |
|---|---|
| Principal Product | furniture frames |
| NAICS |
n/a
|
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
250,000
ft2
|
| Annual Production | 600,000
pieces
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $431,113 | 7,395,956 |
kWh
|
$0.058 |
| Natural Gas | $979 | 185 |
MMBtu
|
$5.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $130,263 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,872 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.3134: Shift from daytime to nighttime operation | $61,508 | - |
$61,508
-
kWh
|
|
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $23,650 | $90,000 |
$23,650
279,894
kWh
|
|
| 03 | 2.1213: Direct warmest air to combustion intake | $13,523 | $50,000 |
$13,523
160,023
kWh
|
|
| 04 | 2.2163: Use minimum steam operating pressure | $8,352 | $6,000 |
$8,352
99,941
kWh
|
|
| 05 | 2.2121: Increase amount of condensate returned | $7,545 | $15,000 |
$7,545
184,642
kWh
|
|
| 06 | 2.3191: Use demand controller or load shedder | $5,325 | $3,000 |
$5,325
-
kWh
|
|
| 07 | 2.6231: Utilize controls to operate equipment only when needed | $4,488 | $3,500 |
$4,488
149,766
kWh
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,182 | $1,991 |
$4,182
47,773
kWh
|
|
| 09 | 2.7111: Reduce illumination to minimum necessary levels | $1,690 | - |
$1,690
19,930
kWh
|
|
| TOTAL RECOMMENDED | $130,263 | $169,491 |
$130,263
941,969
kWh
|
||
| TOTAL IMPLEMENTED | $5,872 | $1,991 |
$5,872
67,703
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs