ITAC Assessment: MO0289
ITAC logo
ITAC Assessment: MO0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Recreation Equipment
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 405
Plant Area 160,000
ft2
Annual Production 8,700
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,822 4,348,769
kWh
Electricity Demand $50,350 860
kW-mo/yr
Electricity Fees $25,774 -
Natural Gas $168,823 48,015
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $4,781 $5,125 $3,727
85,873
kWh
$1,054
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $600 $40 $483
11,137
kWh
$117
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $1,341 $105 $1,107
25,498
kWh
$234
-
kW-mo/yr
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $804 $885 $(-572.0)
(-13,189)
kWh
$293
-
kW-mo/yr
$1,083
-
MMBtu
- - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,800 - - - - $1,800
-
lb
- -
06 4.611: Begin a practice of predictive / preventative maintenance $13,480 $3,700 - - - - $13,480 -
07 4.111: Add equipment/ operators to reduce production bottleneck $33,048 $2,000 - - - - - $33,048
TOTAL RECOMMENDED $55,854 $11,855 $4,745
109,319
kWh
$1,698
-
kW-mo/yr
$1,083
-
MMBtu
$1,800
-
lb
$13,480 $33,048
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs